Process Chains with Control M

Hello Friends,

We are planning to use Control M to process all BW Process Chains.. I see there is good document "Improve Control-M's Handling of BW Data Loads with These Enhancements" in www.bwexpertonline.com.

If anybody has this document please let me know if you like to share me.

Here is the link

http://www.bwexpertonline.com/archive/Volume%2001%20(2003)/Issue%2006%20(June)/V1I6A2.cfm?session=

Thanks in advance

Mavi

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on May 06, 2005 at 11:57 AM

    Hi Mavi,

    unfortunately, I won't be able to help you much about this. We are also thinking about interfacing Control-M with BW jobs but we have absolutely no idea of where to start with this (we are Basis team, we have no real knowledge of the processes of BW).

    Would you mind to contact me to exchange ideas about this ?

    Thanks for your time,

    Seb

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on May 14, 2005 at 01:30 AM

    I am currently leading a project, which includes implementing Control-M/CM for SAP. Our project includes scheduling and monitoring dependencies between SAP R/3 and SAP BW, including process chains. From the communications within this topic, it appears that there are others that are also considering these options. If you are interested, I would welcome the opportunity to organize an initial conference call to determine if we can help one another through a collaborative effort.

    Currently, we use Control-M (option for SAP) for the R/3 scheduling. With the growing demands in BW, particularly for the current project I'm leading, a more robust solution is needed to accomplish our operational goals on the BW side. We have Control-M/CM for SAP installed and connected with a BW sandbox and are currently reviewing the functionality.

    Please feel free to e-mail me at kmenke@semprautilities.com if you are interested in such collaboration or would like to discuss further.

    Sincerely,

    Kevin Menke

    Software Development Team Lead

    San Diego Gas & Electric, a Sempra Energy utility

    IT-Shared Software Development Services

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.