cancel
Showing results for 
Search instead for 
Did you mean: 

Schedule line issue

Former Member
0 Kudos

Hi,

i created a sales order and when i check schedule line category confirmed quantity date is showing 24.01.2013 instead of 25.01.2012.

i tried to change the date of confirmed quantity but system is not allowing to change

i clicked on schedule line tab and selected SALES DETAILs Button and tried to change the dates from shipping tab but system is not allowing to change

I checked the stock also which is available in unrestricted use moreover that this is my first entry of sales so there are no question of scedule for delivery of stock

i checked sales document type - lead time where nothing is mentioned and i havent maintained MRP views also as the sales is taking place from Depot.

thanks

shibu chandran

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

generally system will allow you to change the scheduled dates when stock is available,confirm with your technical team is there

any enhancement causing to this behavior.

Regards

Ram

Former Member
0 Kudos

Hi,

please give me some more suggestion?

Thanks

Shibu Chandran

jpfriends079
Active Contributor
0 Kudos

Check with your schedule line category getting determined and subsequently checking rule for it in configuration.

Any ways, you can reschedule the same using Tcode V_V2.

Regards

JP

Former Member
0 Kudos

Hi,

schedule line category is properly determined, only prob is that confirmed quantity is wrongly appearing which means showing 24.01.2013 instead of 25.01.2012.

thanks

Shibu

Former Member
0 Kudos

HI,

do we need to do something with Factory Calendor?

Thanks

shibu

Former Member
0 Kudos

Hi Shibu,

I don't think the factory calender is the cause for the issue,check your system date if it is 25.01.2013 system might be

considering this.

Check and revert

Ram

jpfriends079
Active Contributor
0 Kudos

That's why. Apart from checking Schedule Line category determination.

I advise you to check checking rule configuration. i.e., availability check control configuration.

Regards

JP

Former Member
0 Kudos

HI,

Could you please give me more insights to check the area?

Thanks

Shibu

jpfriends079
Active Contributor
0 Kudos

Say in your material master Availability check in maintain as 01-Daily requirements

Use TCode OVZ9.

Availability check

01-Daily requirements

Checking Rule

A-SD order

Further, also, check

1. Material Master (MM02) MRP2 Tab.

In In-House production and GR Processing Time, what figures are mention.

2. While creating sales order, I hope Req. deliv.date is not provideda date from 2013.

For reference / understanding, you can refer following link:

- [ Availability check configuration & its impacts ||there are many links & post available in Forum. Please search]

Regards

JP

gino_babu2
Participant
0 Kudos

Dear

Please check wether the material is reserved for some other sales orders in MD05

regards

Sidhu

Answers (1)

Answers (1)

former_member223981
Active Contributor
0 Kudos

Hi Shibu,

Please clarify when you are referring to "confirmed quantity date", are you referring to the confirmed delivery date or the confirmed material availability date?

If you are referring to the confirmed delivery date, then you need to review the whole scheduling that is executing on the sales order. An explanation on scheduling can be found here:

https://wiki.sdn.sap.com/wiki/display/ERPLO/AvailabletoPromise+%28ATP%29?focusedCommentId=263653439#comment-263653439

If you are referring to the confirmed material availability date, you need to use CO09 to analyse the availability situation. For sales orders, checking rule A is used so you access Co09 wth checking rule A.

Hope this helps somewhat