on 12-23-2016 6:07 AM
The ECC-Ora is migrated from small server to test server (heterogeneous).
The test server is having good hardware configuration (multicore, 1TB RAM, 6TB HDD).
Two queries:
- Can Ora to HANA migration be done on same single server (non-Production system)?
- Can additional ECC-Ora installed on same server having ECC-HANA running?
No specific notes / docs found on this topic. Any source to get doc / info on this requirement, pl share.
Thanks, Subhash