Dear Sir,
Our company following process is incomplete, kindly correct us please if we are following wrong method:
Current method
1. We have two storage location one is 2101 (for production) and other is 2001(for warehouse).
2. Whenever we receive the material GRN is been done in storage location 2001
3. Then production people while doing packing plan, ask for material from storage location 2001 to 2101
4. For this production people create reservation through mb21 and reservation number gets created.
5. Then warehouse people transfer the material through mb1a through movement type 311
Issues:
1. Reservation list remains as it in mb25
Solution required :
1. How can warehouse people can transfer the material through generated reservation number so that reservation list can be closed.
2. Or any other method if we are following some wrong system