ATP Re-Run in background processing for sales order

Former Member
0 Kudos

Hello All,

In sales order i need to re run the ATP check for the quantity confirmation in background processing.

Scenario is :

I have created orders with order quantity 100.

while creating the order stock for the same material was only 20 so ultimately it will not confirmed the quantity.

After the some period i m increasing stock of same material by 120. Now, same order which i created before can be confirmed as i need only 100 quantity in that. but for the same I need to manually run the ATP again and then it will confirm the quantity.

instead of manually re run the ATP again i want to do this activity in background processing so that it will automatically confirmed the stock once inventory increased.

Is there any provision in sap to avoid this manual task with the help of background processing or any program?

Thanks and Regards,

Rasik

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hello,

There are two methods for that. 1) Automatic 2) Rescheduling which is manual

you check out the following link which may be helpful to you.

http://www.se80.co.uk/sapreports/s/sdv0/sdv03v01.htm

And the program for automatic updating backorder is SDV03V01 which you can set up in the batchjob at particular interval which will run everytime and the quantity will get updated.

Hope this will help you.

Jay

former_member211108
Contributor
0 Kudos

Hi,

This can be achieved by rescheduling the orders .

<< Moderator message - Cut and paste response from http://help.sap.com/saphelp_470/helpdata/en/93/744c0c546011d1a7020000e829fd11/content.htm removed and points unassigned. Plagiarism is not allowed in SCN >>

You reach the Sales screen.

Select Environment ® Backorders ® Rescheduling ® Execute.

You can also simulate the backorders for rescheduling before confirming by selecting the simulateevaluate option.

Prerequisite for rescheduling the line items of the order is that at schedule line you should not flag the field fixed date and quantity field. Also for ATP you must have defined the scope of check with checking rule BO(i guess) for that particular plant in combination of checking group .

Hope this will help you.

Thanks and Regards,

Atulkumar Dagade

Edited by: Rob Burbank on Jan 24, 2012 10:16 AM