Hi,
I have created the Maintenance startegy for fleet such as : PM order should be generated after every 5000kms. (Unit : KMS)
I have created a fleet object and assigned a measuring point to it. (Characteristics of the measuring point is KMS). I have entered AnnualEstimate : 100,000. for the measuring point and created a measuring document of reading 1kms.
Then, I have created Strategy based Maintenance Plan(IP42), added equipment, counter, task-list etc.
Now I have scehduled the maintenance plan.
Lastly, I created the measuring document. Lets say I entered 4000kms.
Now, T-Code IW38 should populate my PM Order for the fleet but its not happening.
Kindly help.
Thanks in advance.
Tom.