Hello All,
Please i need help for the scenario described below:
Material X exists on storage location 1234 and 5678 in Plant 1000. Also, this material can be transported to other Plants from any of this storage location. Currently, I have configured the picking location based on Plant/Shipping point/Storage condition, and only storage location 1234 is determined.
Is there a way i could configure the the 2 storage locations as picking locations at different point in time.
Urgent help needed.