cancel
Showing results for 
Search instead for 
Did you mean: 

Storage Conditions

oluwatosin_oladipo
Participant
0 Kudos

Hello All,

I need help in the following scenario.

Material A exist in 2 storage locations in a plant. How do i configure these 2 storage locations to be determined as picking locations?

Also, is it possible for a material to have more than 1 storage condition in its material master, having more than one storage location?

Thanks.

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member182609
Active Contributor
0 Kudos

It is not possible to have 2 different storage conditions for the same material as it is applicable for Plant level.

You can configure one picking storage location in Picking location determination in SPRO,However you can replace the storage location by entering supplying plant storage location In Stock transport order.This Fied available in ECC 6.0.You can give different storage location in PO.