while creating production order, i am getting the below error

"No working/operating time maintained in work center for scheduling"

Accepted Solutions (0)

Answers (5)

Answers (5)

0 Kudos

Hi,

For that work center in CR02 go to scheduling tab assign the capacity category and select the capacity category header.In the capacity header screen maintain the start time and the finish times , capacity utilization and no. of individual capacities.Once you do this the operating time will show up in that screen and now try creating production order.

Thanks,

Ravi

0 Kudos

Hi nandi6346 ,

It will be encouraging to the users if you give points once your question is resolved.

Thanks,

Ravi

Former Member
0 Kudos

Hi,

Check following thing,

1.Check whether you have maintained time in capacity tab.

2.Check scheduling tab formulas.

3.Check in control key whether scheduling has been activated.

The error shows below message

C7014 - No working/operating time maintained in work center for scheduling - C7 014

Vendor Master (General Section) General Material Data

This documentation is copyright by SAP AG.

Diagnosis

No operating time has been defined for the work center specified in the operation.

System Response

Scheduling is carried out on the basis of an operating time from 00:00 hours to 24:00 hours.

Procedure

Maintain the operating time in the work center.

So maintain correct time in capacity tab

Regards / US

Edited by: Umashankarpmgl on Jan 20, 2012 2:58 PM

Former Member
0 Kudos

Tried all the specified solutions, but still the error is coming

Former Member
0 Kudos

Hi nandi,

Check if Schduling parameter has been maintained in work center. Check all the work centers.

Then check the control key in routing. Check the same for all operations.

vasudevap_pushpalas
Active Contributor
0 Kudos

Dear

Please check the have u maintained Standard Value Key and check did u maintained set up time labor time machine time etc

in routing and check the compound allocation with material maintained

Check in OPU3 & OPU5 enable capacity requirements and scheduling

With Regards

Pushpalas

Edited by: pushpalas on Jan 20, 2012 8:36 AM

former_member186193
Active Contributor
0 Kudos

Hello,

Check in OPU5,whether the check box for scheduling with breaks is included.

Maintain correct timings in capacity tab in work center.

Check the capacity category specified in work center.

Check the control key whether Scheduling is having tick mark.

Hope it will solve your problem.

Regards,

Alok Tiwari