Skip to Content
0
Former Member
Jan 20, 2012 at 06:09 AM

Table For Capacity requirements

1900 Views

Hello Every one,

Does any body know the table which contains details for capacity requirements raised for a planned order and production order raised for a specific tme period for multiple capacity categories.

The table should contain or a logic should exist to link the following fields:

1. Planned order, production order

2. Capacity requirements

3. Capacity category.

4. Period

This is because my current uses capacities of 2 capacity categories (machine and labor) to plan production.

Sincerely,

Aji