Hello Every one,
Does any body know the table which contains details for capacity requirements raised for a planned order and production order raised for a specific tme period for multiple capacity categories.
The table should contain or a logic should exist to link the following fields:
1. Planned order, production order
2. Capacity requirements
3. Capacity category.
4. Period
This is because my current uses capacities of 2 capacity categories (machine and labor) to plan production.
Sincerely,
Aji