Skip to Content
0
Former Member
Jan 19, 2012 at 03:17 PM

How to fix calendar date inconsistency

96 Views

Hello,

I have a problem with closing material period due to inconsistency with actual calendar date. Last closed period in material master of specific cc is 07.2009.(It is test system with IDES database). How to close remaining periods to 01.2012. I can not do it in mmpv.

Regards

Sylvester

Moderator messaage: I cant see any proof for the calendar date inconsistency that you mentioned in the subject. It is the same question about month end closing which was answered many hundred times in this forum., Please search the forum before asking the same questions again. Read the forum rules before posting. thread locked.

Edited by: Jürgen L. on Jan 19, 2012 10:42 PM