Hi All,
My client have requirement, in delivery system should check the manufacturing date of materila batch entered and GR processing time of material from the material master if the difference between these two dates is in past then system should give error to check GR processing time and delivery cannot be process with the given batch. How to do this can you guide me.
Yogesh