Skip to Content
0
Former Member
Jan 19, 2012 at 07:09 AM

issue with delivery creattion

31 Views

Hi All,

My client have requirement, in delivery system should check the manufacturing date of materila batch entered and GR processing time of material from the material master if the difference between these two dates is in past then system should give error to check GR processing time and delivery cannot be process with the given batch. How to do this can you guide me.

Yogesh