Hi,
In ECC 6.0 after my last operation has been confirmed with AUTO GR. MIGO proposes the planned Scrap quantity against the Production Order for Goods Receipt. Is there a way to stop this.
Here is the scenario that I am facing this issue.
I have a production order with Qty 103 with 3 QTY as planned Assembly scrap.
At the last operation I do 98 yield, 2 rework and 3 scrap. My Rework Reason Code inserts a rework operation using trigger point in the production order. Now after I confirm Rework Operation when I got MIGO for Goods Receipt it proposes me 5 (i.e. 3 Planned Scrap plus 2 rework).
Is there a way this behavior be stopped.