standard cost estimate for product, missing activity type

hi all, please help with followed situation...

I am not able to get activity type in CK11n, is there anything missing.

I have maintained activity types in work center and tested formula also,

Did KP26 also

checked OKKN, OKTZ, OKK4

routing has maintained correctly with all standard values..

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Jan 18, 2012 at 06:58 PM

    Hi,

    Check the usage for costing which you configured. Check the usage of your Routing. In the valuation variant for costing variant you need to check the version for activity price and usage for routing.

    Revert for further clarificaiton.

    Thanks

    S.Subbiah.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.