cancel
Showing results for 
Search instead for 
Did you mean: 

system messages were generated message CK419

Former Member
0 Kudos

Hi ,

while running ck11n i am getting these log system mmessages were generated see log CK419, can you let me know where to look to correct this log.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Check in your system using T.Code OPR4_CK. You get the details of error messages.

Send the error for analyse purposel..

Thanks

S.Subbiah.

Former Member
0 Kudos

Hi ,

I have no clue about CK419

413 - & cost estimates can be deleted

414 - Costing variant & does not allow marking or releasing

415 - &2 cost estimates can be deleted out of the &1 selected

416 - Material &1 in plant &2 has costing number &3

417 - Material &1 in plant &2: key date for currency conversion not set

418 - No cost components defined in cost component structure &

419 - System messages were generated. See log

420 - Enter a costing run, a plant or a company code

421 - Select at least one option for automatic/additive costing

422 - Select at least one option for costing with/without qty structure

423 - Cost estimates to be archived must be in the past

424 - Material & in plant & has no BOM

Thanks

Former Member
0 Kudos

Hi,

To avoid error message and also run transaction use T.Code OBA5 and assing the message number as information.

It will work.

Thanks.

S.Subbiah.

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Subbu,

Can you explain how to use oba5 what work area and in detail step by step process,

but i would like to know why this message is coming .

Thanks

Former Member
0 Kudos

HI,

In some cases we need to use this process. Use T Code OBA5 and application CK and assign message no 419 and messages status as information.

Hope you understand.

S.Subbiah.

Former Member
0 Kudos

Hi Subbu,

But its not letting me add this no. 419

Former Member
0 Kudos

Hi Subbu,

Thanks for your patience, Its a green message, but while running CK24 also getting message where as i should get a message like summary, price of 1 material updated material and also price change document posted which i am not getting but price is getting updated in the material master,,Also can you please explain me how planned price 1 , planned price 2 , planned price 3 works do we need to chnage the valuation stragey to planned price 1, planned price 2 like that or how does it work, i tried to run the cost estimate with a fiture planned price 2 and future date in ck11n, but ots picking up only plnned price 1, i changed the valuation variant to strategy planned 2 as second sequence stioll its not picking up.

Thanks

Former Member
0 Kudos

Hi,

Planned price 1, 2 and 3 these are text fields. It is only used for CO Module.It can be used for Material determination.Normally for ROH it need to determine Moving average price. But some time the business want their own standards. In that case u can use planned price 1,2, AND 3. Some time they want different standared, normally standard variant PPC1, once you relase cost estimate it update in the standared price in material master.Some time the business also need different purpose to update in Tax price 1,2, and 3 etc.

Hope you understand.

S.Subbiah.

former_member309133
Active Contributor
0 Kudos

Hello Taanya

Plan price field in material master can be used for any purpose. These are not used by standard system anywhere and so there will be no impact in other fields.

The system picks the price as per the strategy assigned in valuation variant. In your case you have given the plan price 2 as 2nd strategy. If your first strategy is plan price 1 and system gets the price there then it will not go to the 2nd strategy. Please check if you have a price for plan price 1.

Sangram

Former Member
0 Kudos

Hi sangram,

Plan price is given first preference and also plan price is given in material master, while runningg ck11 getting message ck419, and while releasing in ck24 getting ck714, and price is getting updated in costing tab 2 of material master, i found nothing in opr4_ck. please help

Thanks

Former Member
0 Kudos

Hi Snagram ,

One more question , can we execute ck24 with 2 variants like ppc1 and ppc2 in the same period , i know we can have differnt valuation strategies for differnt plants, and also let meknow how we get the variant in ck24 , i have configured a new variant but i don't see it in ck24 , where to make configuaration so that i can see it in ck24.

Thnaks

former_member309133
Active Contributor
0 Kudos

If you enter plan price 1 as first strategy and then plan price 2 then system will look for plan price 1 first. If there is no amount then system will go to plan price 2. The messages you are saying are information messages. As there are no error messages you are able to mark and release the cost.

Sangram

former_member309133
Active Contributor
0 Kudos

You cannot use two costing variant in one month. When you mark the current month with a costing variant system will update the cost with that variant only. With the other variant you can only run CK11N and not CK24. However you can use other variants which do not update standard cost. If the costing variant updates the cost in other prices then you may run the CK24 to update the price in another field say plan price 3 or tax price and so on.

Sangram

Former Member
0 Kudos

Thank you, it was very helpful answer, but i am not able to see other variants in ck24 drill down , which are configured in okkn , ppc2, ppc2, ppc3, zpc2, zpc3, whiich are confured for plan orders, actual orders and some other variants which are configured , i am not able to see them in the drill down , hhow can these varinats be seen in the drill down of ck24 varint selection.

Thanks for your valuable answers.

Former Member
0 Kudos

Hi ,

In the valuation variant i gave the sequence planned price 3 for testing purposes, and material m,aster i gave 3 plannned prices, but when i run ck11n its picking up the planned price 1 even i entered the future date

Thanks

Former Member
0 Kudos

Hi ,

In the valuation variant i gave the sequence planned price 3 for testing purposes, and material m,aster i gave 3 plannned prices, but when i run ck11n its picking up the planned price 1 even i entered the future date

Thanks

Former Member
0 Kudos

Hi ,

In the valuation variant i gave the sequence planned price 3 for testing purposes, and material m,aster i gave 3 plannned prices, but when i run ck11n its picking up the planned price 1 even i entered the future date

Thanks