Dear Sir,
We have ETO scenario and are in the business of manufacturing "Industrial Machinery" . We are using Project System (PS) also . After the final assembly the FERT Equipment gets ready and then it is put on trial for testing . After the successful trial the equipment is again disassembled into the desptachable parts and then delivery are created from the project .
Along with the Equipment , we also send the free spares and installation parts.
Kindly guide us as what steps need to be followed so that we can have Packing List generated from the SAP system for the items being shipped to the customer .
With Thanks and Rgds
Anil Kamat