Hi Expert,
I need your clarification if my current scenario is correct:
In the product location, we plan it manually using product heuristic:
Product Heuristic: SAP_PP_002
PP Plng Procedure: Manual Without Check
Procedure: lot-for-lot
Safety Stock Method: MZ
Safety days: 10
Procurement type: F
The result of the product heuristics only generates the purchase requisition if the stock level falls to 0 or the actual days of supply falls to 1 day and it only generate lot-for-lot result. Is product heuristics doesnt consider safety days in its planning? Is SNP heuristics the only way to have the planning generate the correct result?
Thanks
Lhon