Hi Experts,
Here is a situation for which I need help immediately
Situation:
ECC, SRM and BW systems were copied to other location. Data was till Dec 2011 when all the systems were copied. From then BW is loaded ( master data & transaction data - delta as well as full ) with ECC and SRM data till 1/15/2012.
Then BW system got crash on 1/16/2012 and now again copied back and data is till Dec 2011. Note: ECC and SRM systems are fine.
Now I need to update the data in BW from ECC and SRM till date i.e. 1/172012.
My doubt is;
1. As the data after Dec 2011 to 1/15/2012 is loaded to BW before it got crash, will my regular delta loads pull the missed data?
2. Do I need to perform a repair full for all the delta loads and again perform the normal delta?
3. Is it suggestible to clean complete data in BW and perform fresh init's and delta's?
Please suggest
Sunil