Former Member
Jan 17, 2012 at 01:02 PM

Logs in MM12

316 Views

Hi,

I have created a change in CC01 for material and BOM. With reference to the change number created in CC01, i am scheduling changes to material master in MM12 and then running MM13 for making the changes. After changes in MM13, i can only view what changes have been made in MM13.

What i want is a log where i can know what changes were scheduled in MM12.

The issue is that the changes i have scheduled in MM12 are different from the changes made in MM13.

Regards

Prakash