Hi,
I have created a change in CC01 for material and BOM. With reference to the change number created in CC01, i am scheduling changes to material master in MM12 and then running MM13 for making the changes. After changes in MM13, i can only view what changes have been made in MM13.
What i want is a log where i can know what changes were scheduled in MM12.
The issue is that the changes i have scheduled in MM12 are different from the changes made in MM13.
Regards
Prakash