Skip to Content
0
Former Member
Jan 16, 2012 at 11:09 AM

PO logic issue

131 Views

HEllo

There is a requirement when PO is saved the system should check the drawing status of the material in Material master and block PO creation accordingly

Question:

The drawing status is not captured in MARA table and seems to linked with DMS.

Can anyone help me out with the link between DMS table (DRAW/DRAD etc) and material master.

Moderator message: priority normalized

Regards

Avinash

Edited by: Jürgen L. on Jan 16, 2012 2:05 PM