Hi Guru,
I have material with MRP type VB, reorder point 250, safety stock 100, Available qty 199. Plan del. time 5 days,GR processing time 1 day, min lot size 50
Why I run MRP(ME57) system doesnt triggered for purchase requisition(PR). where should I check the error?
Thanks in advance.