We have negative leave.
We run time evaluation on a daily basis. Employee's vest leave every month, but not all on the last day of the month.
One month from your appointment date, leave accrual. Every day time evaluation runs form the "PDC Recalcutation" date on info type 0003.
I want to run time evaluation in the payroll using schema TC00. This is only to get the leave accrual for the rest of the month. I need this to ensure the leave provision is correct. Now transfer of the leave should be done to IT2006.
When I insert the rule from the time Schema to TC00, the calc is correct and I can see the days when display table TES.
Two problems.
- Time Run for the whole month. Employees will then accrue double. I want ths Time Schema to also read the PDC recalc date on info type 0003.
- I Can display the days the TES table, but when I try to read the TES table (HRS=D) and add that ot ZL table. nothing happen. Is there a way to read TES in the payroll.
Regards,
Frances