WM-PP interface - material staging

hi gurus...

With PP interface activated for WM, the production orders have material staging.

when the production order is released and upon saving, i always get a warning message "warning message issued during WM staging" and the log says "WM staging executed without error".

How do i get this warning message to be not active when there is no error "ERTR".

Thanks ya!!!

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 13, 2012 at 03:32 AM

    Hello,

    This message is occured because,you must define a production scheduling profile in the Customizing for Warehouse Management under, Interfaces -> Define Production -> Define Control Data ->Production View

    Automatic material staging is active in the standard system. The Warehouse Management system (WMS) automatically creates the transfer requirements (TRs) needed for material staging.

    Please refer the below link for more information on Material stagging

    http://help.sap.com/saphelp_470/helpdata/en/c6/f841704afa11d182b90000e829fbfe/content.htm

    Hope the information was useful

    Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 20, 2012 at 08:22 AM

    automatic creation of TR is not active and production scheduling profile is set.

    The warning message "WM staging is executed without error" when releasing the production order is the result of automatic TR?

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 20, 2012 at 08:26 AM

    control cycle used is Release parts. Does this have an influence?

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 27, 2012 at 12:44 AM

    sovled

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Suresh Bachan

      Automatic creation of TR is for pick parts (control cycle.

      In the production scheduling profile assigned to the material (OPKP), Transport --> WM request --> change to "No creation of transfer requirements on order release".

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.