Hi All,
I am trying to create the below scenerio which uses Branch step but i am facing the error as below
"Branch has an Invalid connection" , "Unable to save Workflow"
I have a the design as below which are connected using connector
1. start
2. process
3. branch (two connectore one connecting "a"(process step) and other connecting "b"(stop step))
a) Process ---> Stop
b) Stop
Please let me know where i am going wrong.
Thanks in advance
Regards,
Sharma.