Hello,

I have the following scenario - I have two plants, 1000 and 2000, both under the same company code.

I transfer 450KG of material 123456 from plant 1000 using STO with SD (mvt. type 641), material is packed in HUs. In the receiving plant, the HUs are being place on a weight to check their actual weight. It;s possible for the actual weight be greater than the GI weight of 450KG (for example, due to weight scale accuracy issues) . When doing GR, I need to be able to receive quantity greater than the GI quantity. That is not allowed in stock transport order (per note 212387). For the same scenario with intercompany STO (GI mvt type 643) I'm able to post GR quantity which is greater than GI qty.

Any suggestion on how to solve this? Can I create a customer order type that is both intra-company and allows for overdelivery?

Thanks,