Dynamic modifications for supplier status , time and rejections.

79 Views

Dear QM Gurus ,

Just want to share a scenario with you and know your views and solution strategies on the same .

There is need of reduced sampling in which only a few characteristics are visible and availabel for result recording for the following conditions . This is clearly a case of dymanic modification .

1. Vendor has status certified .(it is a prefered vendor which is allowed reduced sampling and testing ).This certified status will be maintained in Q info record . All other vendors shouldhave full testing ( RR for all MICs of tha plan )

2. If a lot from certified vendor is rejected, next two lots should have full testing ( all MICs for RR)

3. Irrespective of any rejections ,the first lot after every two years has to be fully tested .

There is full testing for all the other types of vendors and all other cases .

Can you suggest a step by step procedure for config and master settings for the above dymanic modification ?

Full points to be awarded for complete and correct answer .

Ram .