Dear Gurus,
I have three questions.
1. I have created a PR with vendor material number, but initially vendor material number did not copy to the PO. Then I assigned a desired vendor along with vendor material number. It got copied to the PO. After that I created another PR with vendor material number and without vendor code. That vendor material number copied to the PO. Why is this?
2. I have created a PO for full quantity given in the PR, but why closed tick in the PR is not set automatically.
3. Can set this close tick in the PR when creating the PO.
Thanks,
Chameendri