Dears
Please see one scenarion below
One of my raw materl say X is assigned to two header material say A and B
A and B is on strategy 40 and X is strategy 10
All lot size is EX
now i give demand for A and B on 20.01.2012 for 1 qty each
both routing and BOM is same
aftert running MRP on A and B Depent requirment for X was created in two planned order with different dates(one is 17.01.2012 and other one 18.01.2012)
as i expected (as per my master data)for both planned order in same dates
Please tell me why system show two different dates for planned order
Abu Fathima