cancel
Showing results for 
Search instead for 
Did you mean: 

Assembly Scrap

sameer_mehta
Participant
0 Kudos

Hi,

While creating planned order in MD11 when I enter 100 quantities it is automatically recalculated to 110 and scrap quantity to 10. As 10% assembly scrap is maintained in Material Master.

So is there some configuration setiing such that the system will not calculate the scrap quantity i.e. it will bypass the assembly scrap % maintained in Material Master.

Please help...

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member184655
Active Contributor
0 Kudos

Dear Megamin,

Why do you define an assembly scrap and then to ignore the same?

If you want the assembly scrap to be ignored for determining the BOM component quantity then you can set the net scrap

indicator for each BOM component in the basic data tab page in CS01/CS02.

In MD11,after entering the order quantity and date ,now the system will propose the scrap quantity,try by removing this 10

quantity from scrap field and also change the order quantity as 100 and press enter and check whether are you able to create

the planned order for 100 quantity and the BOM components are proposed only for this 100 order quantity.

Regards

Mangalraj.S

sameer_mehta
Participant
0 Kudos

Thank you for your solution but is there any configuration to do this instead of maintaing assembly scrap fand changing net id in BOM (CS02). for all the materials... such that the same setting will apply to all the materials...??

former_member184655
Active Contributor
0 Kudos

Dear Megamin,

In my understanding there is no configuration to skip this during manual creation of planned order.

This is mainly used for the order proposal for the product and also to plan the BOM components in extra as per the scrap %

defined for the assembly.

What you can do is as I have suggested is only during manual creation of planned orders once after entering the planned order

quantity,remove the quantity proposed in the scrap field and also adjust the planned order quantity and check the BOM

components whether the system is calculating as per to the order quantity(without extra planning for the scrap %).

Check and revert back.

Regards

Mangalraj.S