We are currently using 2LIS_02_S012 to extract purchasing data to BW.
We now want to phase in the LO extractors.
The open questions that we have are:
1. We want to import a transport to ECC which contains the active versions of the LO extractors. If we import this transport is there any possible side
effects to the 2LIS_02_S012 extractor and if so what are the additional steps we would need to take
2. Is there any consequences/considerations in having 2LIS_02_S012 and the PU LO extractors running in parallel - we will have a parallel run during the phase
in stage
3. Has anyone carried out a setup by avoiding downtime and if so how
Thanks