Skip to Content
0
Jan 03, 2012 at 02:02 PM

No inspection lot can be opened for this material and vendor

56 Views

When i use a status scheme in the quality info record i cannot receive a batch until i finished the previous inspection lot. When i try to perform a goods receipt i get the following message "No inspection lot can be opened for this material and vendor". How do i prevent getting this message. I need the status scheme for my LIMS interface, but it's for information purposes only.

Thanks.