Hi Expert's,
I am trying to create Summary and Detail Report using BI 4.0 BICS connection.
When I try to create hyperlink for opendoc from summay to detail report it is constantly failing only for Calander
Date prompt coming directly from Bex.
Getting below error message which has been fixed by SAP in patch 9, we are still facing the issue, the hyperlink is
shown below, let me know if any workaround.
="<a href=\"../../opendoc/openDocument.jsp?iDocID=ASNCYk68wtBJmjp7QQR54ps&sIDType=CUID&sType=wid&sRefresh=N&lsMZVAR_ZCTRCNGDT_INT_MAND="URLEncode(UserResponse("ZVAR_ZCTRCNGDT_INT_MAND"))"&lsMZVAR_BBP_CTC_ID_MULT_OPT="URLEncode(""[Contract ID])"&lsIZVAR_BBP_CTC_ID_MULT_OPT="URLEncode(""[Contract ID])"\" title=\"\" target=\"_blank\" nav=\"doc\">"[Contract ID]"</a>"
Error we are getting:
ADAPT01580012
Link to a WebIntelligence report using syntax OpenDocument fails when target document contains a prompt
based on a BEx variable of type Interval. Error message is "An internal error occurred while calling
'answerPromptEx' API. (Error: ERR_WIS_30270)".
Behavior is now correct and refresh operation takes into account interval answer passed in OpenDocument URL.
We applied above said patch9 and system is BI.4.0 SP02 Build556(patch9).
Bex varialbe says 'Change Date (Interval) and then displays Start Date and End Date to chose from Calander which comes with time stamp.
Thanks,
Suresh