hi, everybody.

We prepare transition from version 4.5 on 5.0.

I have a local problem (task) - to understand new features of PS - PPM Integration scenarios.

Earlier I worked with version 4.5. Now i have 5.0 sp 06. And erp - ECC 6.0 ehp 3 for PS.

I heard that there were new possibilities for Integration moments. But I do not understand (not assured):

1. Is it true, and where i can read about this? Please send to me the letter if there is an information.

2. It is necessary to install EHP5 to ERP or It doesn't influence new possibilities?

Searched all the day at help.sap.com and service.sap.com - Has found only one useful document "SAP Portfolio and Project

Management: Configuration" for 5.0. Probably read badly, but in it hasn't seen new possibilities

one more -

While has found only one difference - at new ERP system we have new SPRO section at "Integration with Other mySAP.com Components" - "named SAP Portfolio and Project Management".

Maintain Gen. Settings for Portf. and Proj. Mgmt Intgrn

Maintain Controlling Area and Valuation View Mapping

Maintain Settlement Behaviour

Customize Portf. and Proj. Mgmt Value Type

Convert Working Time Unit

3. Do any one know for what it is used?

Thanks.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 30, 2011 at 10:37 AM

    Hi Alex,

    Please refer to the link below for SAP PPM 5.0 features.

    http://wiki.sdn.sap.com/wiki/pages/viewpage.action?pageId=250777127

    And regarding your specific questions, please see below.

    1) With SAP PPM 5.0, now project in SAP PS can be created directly corresoponding to portfolio item in PPM. And ICO integration with SAP ECC is not RFC based rather than Idoc in earlier verision. Refer to the note 1427365 for more details.

    2) Relate to node "Integration with Other mySAP.com Components", with SAP 5.0 not the cost integration with SAP ECC is enhanced and you can influence what all need to be considered for the integration between SAP PPM and SAP ECC.

    Hope this answers your query.

    Cheers

    Amit

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi,

      As per the configuration guide, "You must determine the SAP ERP system to be used for integration into PS by choosing an entry in the object type column".

      Where can I configure connections?

      Regards,

      Karmadon


Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.