Hello,
I have the following situation: A SC is transfered to the BE. For some special products an additional item (limit item) is added in the BE to the PO. This results in the following situation:
SRM BE
1SC 1PO
- P1 - P1
- P2 (limit item, cat=B)
Currently the status 'Fehler im Ablauf' is set obviously of this additional line item in BE.
My question: Is it possible to change the messages/status (CLEAN_REQREQ_UP, BBP_GET_STATUS_2) which is set while a SC is transfered from SRM to BE in this special situation? Is there a BADI in place which can be used?
Kind regards,
Thomas