Skip to Content

calibration process

Dear Friends,

I am new to SAP PM module. I wish to do calibration process by using measurement document. Hence I created measurement document for the respective equipment with the annual estimate and counter reading. I created the maintenance plan based on counter and schedule it. While scheduling , notification has been created in the background and from that notification I wish to create calibration order. At that time of creation, the information in the notification copied to the order but the information regarding maintenance plan alone has not copiied into the order. Therefore, while releasing the order inspection lot has created in the background but there is no characteristics attached to the lot. So I can't do the result recording for the particular lot.

Can any one solve this issue?

Regards

Karthik

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 27, 2011 at 05:42 AM

    Hi Karthik,

    I guess that you have posted the thread in the wrong Forum,

    any ways the key to the Calibration Process is the Task List that you have to define in the Maintenance Order,

    you need to define the Inspection point in the Task List as 300, then the system will give you another Tab in the Operations as the Master Inspection Characteristics.

    there you give in your MIC no.

    can you please tell me in detail where you are getting Stuck ?

    Regards,

    Yawar Khan

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Nellaiappan Ponnambalam

      Hi Karthik,

      Can you check with the QM consultant if the MIC are maintained properly or not and the Sampling procedure and also the Inspection Characteristics maintained Properly.

      still where have you assign the Task List in the Process?

      Regards,

      yawar Khan

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.