Skip to Content

BPC75NW: Data to be mapped from one application into another one.

Hi,

What are the different options to move the data from one application into second application in a SAP BPC75 NW system ?

Basically, data movement is to be done within different applications of the same appset.

Regards,

Pankaj

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Posted on Dec 25, 2011 at 05:00 PM

    Hi Pankaj,

    One way to move data from one App to another in script [*DESTINATION_APP|http://help.sap.com/saphelp_bpc75_nw/helpdata/en/f4/33f0bbc46c4a53860f1410f20ffb8b/frameset.htm].

    Another way is to write a BAdI, but this is a second option for everything:).

    Regards,

    Gersh

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 26, 2011 at 09:46 AM

    Hi Pankaj,

    As mentioned above, you need to write script logic mentioning the destination application and the dimension members for which you want to map data from one application to the other. you can refer to the following link to get reference to write logic:

    http://wiki.sdn.sap.com/wiki/display/BPX/EnterprisePerformanceManagement%28EPM%29How-to+Guides

    Hope this clarifies further.

    Rgds,

    Poonam

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.