Primary Cost component Split

Dear All,

I have activated check box for Primary Cost Component Split in cost component Structure as well as assigned the same cost component to controlling Version. However, still i am not able to get the details of Cost Element which are related for Activity price calculation.

Please do let me know, if i have missed any step for the activation of Primary Cost Component Split. As well as with activation of Primary Cost Component Split can we get reports in OKB5 report?

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 23, 2011 at 05:58 PM

    Hello

    In the customisation of cost element (OKTZ) create attribute like process cost or labour cost or machine cost and then select these attributes and assign the cost element. Here you enter the secondary cost element you have created for labour or machine.

    Do not set the check box primary cost component split as this only takes the primary costs and do not consider the activities which are secondary.

    Activate the cost component split and now take the cost estimate. You can see the activites.

    Sangram

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.