Planned order splitting for material- during MRP RUN

We are using strategy 50 MTO . There is a sale order for 100 qty .Run MD50 and generated planned order for some material (HALB). client requirement while planning itself to generate split planned order for each material by dividing the sale order qty ( ie)each planned order 20 qty.

Always for this material five planned order to be created irrespective of sale order qty.planned order qty should be always 100/5

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 16, 2011 at 06:18 AM

    Hi,

    You can define a production version for the material and in that version specify a distrbution function which distributes the requirement in 20% splits. Distrbution functions are defined in customizing under Production, Basic Data, BOM.

    Alternatively you can distribute requirement quantity by defining a lot sizing procedure with takt time in OMI4. However this type of splitting requires specifying min, max or static lot sizes in material masters.

    Regards.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.