on 12-14-2011 12:25 PM
Hi All,
I am facing an unusal scenario.
User is claming that PR is getting generated for a material after running the MRP, even there is enough stock.
I checked material & I found that MRP type is ND, there is no entry in the planning file for this material.MRP list & stock requirement list of this material is showing nothing. So there is no way that PR will be created automatically via MRP run for this material.
When I checked one PR for this material, Plant & storage location, creation indicator is showing as B Material Requirement planning.
Could you please help me that why creation indicator is showing as B>
I further checked these PRs are created long back when MRP type was V1. Later they changed it to ND.
How to delete MRP generated PR manually when PO has been created for these PR.
Regards
Shilpi
Edited by: sapmm1234 on Dec 14, 2011 6:10 PM
As you said; the PR was created long ago by MRP, when it was not ND.
If it was already converted into a PO, there's no need to delete it, right? If not, just delete it manually.
In the future, when you change MRP type from a valid type to ND, always remember to do 2 additional things, as the system will not do them automatically:
1- delete the MRP list
2- delete any planning elements if they exist, like planned orders and MRP generated PRs.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
GO to transaction code ME52N, put deletion flag and save
system will prompt you message error or warning based on setting.
Purchase orders already exist for this item
Message no. 06152
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.