Hi All,
In SPM 2.1, in the UI, in the bottom left, there is a notification saying "data last loaded on".
We are using a custom method to load data (use of standard BW process chains) and therefore this is not being populated.
Where is this date stored? Ideally i would like to code an ABAP report to run as part of the chain to populate this field.
Thanks
Neil