Skip to Content

Problem with Action and Absence Quota

Dear Gurus

I have two leave type called NBL and PL. when I am running Hiring Action that time Infotype 2006 is called with NBL as default leave type.

I want to configure the same for Confirmation Action but leave type PL.

Please Guide me .

regards

Ankit V

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2011 at 09:34 AM

    Add the Infotype 2001 with subtype PL (What you created for Leave type) in the Info Group (IG) for the Promotion Action.Kindly test It

    Best Regards,

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 14, 2011 at 01:56 PM

    Thanks to all

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.