    Posted on Dec 14, 2011 at 08:43 AM

    Hi,

    yes try this logic.

    make all pir in inactive version from md62.

    Thanks and regards

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 14, 2011 at 08:50 AM

    Dear Ganapthy,

    What's your exact requirement during MRP run through MD01?

    M61X0001 can be used for selecting the materials based on MRP type,MRP controller.

    Come back with your exact requirements.

    Regards

    Mangalraj.S

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 14, 2011 at 10:41 AM

    Hello

    You should consider BAdI MD_CHANGE_MRP_DATA.

    The following statement is available on BAdI documentation:

    "You can use the Business Add-In (BAdI) MD_CHANGE_MRP_DATA to change the MRP data that is read during the following processes.

    - Planning run of material requirements planning, master production scheduling, and long-term planning

    - Creation of the stock / requirements list

    - Planning table of repetitive manufacturing

    Using the available BAdI methods, you can implement a user-defined logic when importing the MRP element from the database.

    In the processes mentioned above, the internal table MDPSX is built up from the MRP elements read from the database. In the standard logic for MRP, it is defined whether an MRP element is taken into account in the MRP and in which form (for example quantity, date).

    You can use this Business Add-In to

    - Take into account MRP elements in certain cases, although they are never taken in to account according to the standard logic.

    - Not take into account MRP elements, which are considered according to the standard logic.

    - Change characteristics such as MRP relevance, dates, quantities and so on, of imported MRP elements

    You can define in your implementation whether you want to take action in the display only or also in planning."

    BR

    Caetano

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2011 at 12:15 PM

    Hi Ganapathy,

    We have user exit in SAP for to make this possible but only if you can explain us your exact scenario.

    1. Does your plant have Pure MTS material only or it has Both MTS and MTO.

    2. We can use User exit in SAP to restrict the Material number selection based on MRP controller but it will be usefull if your scenario is PURE MTS (10).

    3. If you have other strategy such as 40,50 etc where both PIR and MTo is considered for planning then we have look into other option. So please explain your scenario in detail.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.