Hi All u2013
This question is in regards to a BPC 7.5 NW (SP8) input schedule stored in BPC with externally linked MS Excel 2007 spreadsheets stored outside BPC.
I have built an input schedule (which is stored in a team folder) and linked external excel spreadsheets into the schedule. My EVDRE is in Sheet1. Sheets2 u2013 5 contain the links to my non-BPC workbooks.
My problem is that when I use the u201CSend and Refresh Schedulesu201D u2013 u201CActive worksheetu201D, multiple windows pop-up for updating the links in the non-active (external data linked) worksheets. Does anyone have a better way to link data external to BPC in a schedule or report? If not, is there a way to stop these pop-ups?
Thank you!