Skip to Content
author's profile photo Former Member
Former Member

ESS issue in EP 7.3

Dear Experts,

We are implementing ESS/MSS BP's (633) and EP 7.3,

Issue is while we are trying access any of the Ess applications from Portal it throughing below error.

-


500 Internal Server Error SAP NetWeaver Application Server/Java AS

The initial exception that caused the request to fail, was:

com.sap.dictionary.runtime.DdException: Type HRXSSCE_PERNR_GRP_INFO (backend name HRXSSCE_PERNR_GRP_INFO) does not exist

at com.sap.dictionary.types.mdi.util.ProviderUtil.createAbapTypeXmlMap(ProviderUtil.java:396)

at com.sap.dictionary.runtime.mdi.DataProvider.createSimpleTypeFromAbapType(DataProvider.java:575)

at com.sap.dictionary.runtime.mdi.DataProvider.getDataType(DataProvider.java:332)

at com.sap.dictionary.runtime.mdi.DataProvider.getDataType(DataProvider.java:285)

at com.sap.dictionary.runtime.DdStructureShell.refresh(DdStructureShell.java:101)

... 120 more

See full exception chain for details.

Failed to process request. Please contact your system administrator.

While processing the current request, an exception occured which could not be handled by the application or the framework.

If the information contained on this page doesn't help you to find and correct the cause of the problem, please contact your system administrator. To facilitate analysis of the problem, keep a copy of this error page. Hint: Most browsers allow to select all content, copy it and then paste it into an empty document (e.g. email or simple text file).

For further information about the Web Dynpro error page, error analysis and a description of well-known error situations, see SAP note 1113811.

-


Please let me know how to resolve the issue.

Thanks and regards,

Mahee.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2011 at 09:48 AM

    In CE scenario, if the CE popup is enabled, every ESS application checks the table T7XSSCE_GRP for the grouping values. Kindly check the view V_T7XSSCE_GRP if the grouping value entries are properly maintained.

    Hope this helps,

    Regards

    Roy

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 13, 2011 at 02:57 PM

    what is your EA HR component, SP ;level

    You need to redeploy your ESS, SCA files with PCUI

    this is the error due to deployment

    please verify it

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 14, 2011 at 06:53 AM

    Hi Mahee,

    This runtime error normally happens when the frontend support pack is not compatible with the backend ECC support. As Siddharth mentioned, check the link and identify if there are in mismatches.

    This error indicates that the ECC objects delivered by SAP as per CE enhancements are not present. Could you please check if the note-1651329 is implemented.

    Hope this helps,

    Regards,

    Roy

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.