on 12-13-2011 1:08 PM
Hi All,
We have an issue with Preference threshold value valid to date for many materials. As per our understanding the threshold value to date should be 31.12.9999 for all materials, but many materials valid to date is ended with 3rd Aug 2011. We are not very sure how the system determined valid to date as 3rd Aug 2011 instead of 31.12.9999 for specific materials.
Many C-LTVD's status is negative instead of positive due to wrong valid to date. The issue is in production system, not able to correct already issued C-LTVD's since revocation is not possible from negative to positive. Planning to re-issue manually prepared C-LTVD's to customer for impacred part numbers.
Any idea what is teh root cause behind setting up the threshold value valid to date as 3rd Aug.
Regards,
Lakshmikanth
Hi Lakshmikanth,
Is this issue addressed.
If not, then , as discussed, please provide some more details around the same .
Regards,
Jasmit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.