Confirmation Control Key 0004

Hi Gurus,

When I am activating "Confirmation control key 0004" in the existing Scheduling Agreements(created with reference to contracts) system is giving the error "Confirmation control key 0004 not allowed" .

So kindly let me know will system accepts the confirmation if the schedules already partially delivered?

Regards,

A.S.K

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 11:22 AM

    Hi,

    You cannot change the confirmation control key if partial delivery exists for that SA

    Refer this Link

    http://www.sap-img.com/materials/explain-about-the-po-confirmation-control-key-in-detail.htm

    Edited by: redriver on Dec 13, 2011 12:34 PM

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.