Hi,

I have created a DMR as below.

In QDR1--->select " DMR @ lot level.

stage 10 > click on insp stage, Severity 04

stage 20 > tick on skip

stage 10

no. of insp : 1

new insp stage : 20

rej : 1

new insp stage : 10

stage 20

no. of skip : 5

new insp stage : 10

rej : 1

new insp stage : 10

Enter this data & Use this DMR in the inspection plan header.

What I expected to happen is when first inspection lot will be created ,you can do RR & UD for this lot.Once this lot is accepted ,

from second lot onwards Inspection lot will have "SKIP" status.If any one of the 5 lots is rejected then Quality level will reset to stage 10 means under Inspection.

Can anybody tell me how can I test this .. Because in QA01,I have created two inspection lots with 01 type, I have accepted the first one,but still i am getting the second for Results recording and UD..

AM i missing anything,anywhere.

Please help me out.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 02:42 PM

    I'd like to explain the option of 'at lot creation', 'at UD' in modification rule because many people are confused it.

    1) The quality level is updated when UD is saved.

    -This option is useful in normal case (one or little inspeciton lot for a material, a plant, (a vendor) per day)

    -If more inspection lot is created before previous lot is not UDed, all opened lot's level is same with first lot.

    -Because the quality level is updated only when UD is saved.

    -In quality level(QDL3) 'count of lots without UD' is increased for all opened lot and then it is reduced when opened lot is UDed.

    (At the same time 'count of lots since change' is increaed.)

    2) The quality level is updated when an inspection lot is created.

    -This option is useful like as below process.

    -Example process

    You want one time inspection on every week. (most stock should move to unrestricted directly.)

    Many lots are created for a material, a plant, (a vendor) per day.

    If you select 'at UD' in modification rule, many lots are remained in one time inspeciton level, not skipped.

    If you select 'at lot creation', only one lot are remained in one time inspection and other lot skipped evenif lot is not UDed.

    -The quality level is updated when an inspection lot is created and SAP assumes this lot will be accepted.

    -In quality level(QDL3) 'count of lots without UD' is always blank and modification valuation is updated 'accepted' when an lot is created. (evenif UD valuation is blank.)

    Regards, DoWook KIM.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      I am not sure what exactly you are doing ...Read my past thread carefully whch specify all SPRO & QA16/QA17 transaction and how should be performed.

      create a varient in QA16.--->enter material,plant ,UD code ,date etc.

      Now Use QA17 to run the Varient & schedule auto UD in background with varient created in QA16.

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 10:29 AM

    1.In Inspection pla header what is dynamic modification criteria.?

    Is vendor Ticked ?.Have you maintained Vendor in Task list of plant ?( same vendor which you have enterd in QA01)

    2 .Results recording and UD..

    Even if lot is skipped you can do Result recording & UD .

    Is status of Inspection lot is not "SKIP" from second lot onwards( after accepting UD the first one)

    3.Make sure that UD is accepted for prior one.

    4.check QDL2 for chnage in stage.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Now,During lot creation itself i am finding the status as SKIP frm the second lot.

      My question is ,jus by creating the lot how can system give the status as SKIP.I did not do any UD for the first lot,then how is system showing the second lot as SKIP.HOw to go about this.

      This is becaus eof DMR @ Lot level--->which means even if you not take UD of the firt lot second will be skipped whereas @UD level means unless you do UD ( as accepted) next lot will not skip.

      In QA32 -->Usage decision there is tab of stock posting.

      But Remember : DMR quality level change is not depend upon the sock posting ,it depends upon UD code.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.