shop floor control all settings every ones importance

What are the shop floor setting and pls give every ones importance?

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 13, 2011 at 07:20 AM

    Dear

    Before running any order one should no the settings in master data after master data settings done then it should followed by shop floor settings and depends on the Business Process we need to do the settings

    The listed below are shop floor setting :

    1. Define Production Order Types : OPJH

    2.Define order type-dependent parameters : OPL8

    3.Define Checking Rule : OPJK

    4.Define Confirmation Parameters :OPK4

    5.Define Scheduling Parameters for Orders : OPU3

    6.Define number ranges for order : CO82

    7.Define number ranges for confirmations :CO80

    8.Define number ranges for reservations : CO83

    9.Define number ranges for operations :CO81

    10.Plant Parameters : OPPQ

    11.MRP Group : OPPR

    12.Define Control Key : OPJ8

    With Regards

    Pushpalas

    Add a comment
    10|10000 characters needed characters exceeded

    • Hi,

      Check the below points to configure the SFC:

      The Bills of Materials in relation to the Shop Floor Production Order

      Define the Production Order Type

      Where-is the Production Order Type used?

      Define the Production Order Type-dependent Parameters

      Define Checking Control

      Define Confirmation Parameters

      Define Scheduling Parameters for Production Orders

      Define Number Range

      Define selection profiles for the Order Information System

      Define the Production Operations Control key

      Where-is the Control key used?

      Define formula parameters for Work Center

      Where-is the Work Center Formula Used?

      Define the Production Scheduling Profile

      Define Production Scheduler

      Where-is the Production Scheduling Profile and Production Scheduler Used?

      Select Routing Automatically

      Where do you define the Usage and Status?

      Define Default Values If No Routing Exists

      Define Priorities for BOM Usages

      Define Checking Group

      Define Checking Rule

      Define Scope of Check

      Specify Scheduling Type

      Define Standard Value Keys

      Hope it will help you.

      Regards,

      Alok Tiwari

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.