In time Consumption of Raw material in case of Subcontracting

HI Gurus

Please look into the following issue.

Presently we are sending Raw material to subcontracting vendor through 541 mvt type along with excis challan.Then subcontractor intimates raw material consumption details time to time through mail/fax.Now as per client requirement raw material consumption should be done in time i.e. when they are receiving raw material consumption details. They don't want book the raw material consumtion at the the time of receipt of finish goods.

Please guide me to book in time consumption of raw material.

Redards

Kumar

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 05:02 AM

    Hi,

    In normal sub con process goods get automatically consumed as per BOM during goods receipt. In your case it is a work around. Do MIGO time to time when you want to consume the material whithout receiving the finished product.

    Kiran

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 05:07 AM

    Thnks for your reply.

    I want to do the manual consumption from subcontracting stock. Client don't want to book the consumption at the the time of raw material transfer to subcontractor. Also there will be problem in subcontracting challan reconcillation.

    We can't do the manual consumption through 543 mvt type .Is there any workarround for this ?

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      HI,

      Manual consumption is not suggested since the value of goods returned from job worker should have the value of goods consumed b job worker.. or else material MAP will go wrong..

      Need to check whether special cases manual consumption of stock with job worker provided by SAP.. will get back to u..

      sBk

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 06:53 AM

    You cannot consume the material issued to the sub-contractor manually.

    The only thing you can do MIGO- GI -other- with MT-201, then reverse it MT-202 when taking the final goods from the sub-contractor if you have enough stock. Else it is not possible and advisable to book in advance.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.