Skip to Content
author's profile photo Former Member
Former Member

LSMW ISSUE

hi experts,

I have to upload material master through LSMW & stock also my question is wheather i have to use lsmw different for material & stock upload or I use combine lsmw for stock upload & material upload how to achieve combine both?

Regards

sangita

Add a comment
10|10000 characters needed characters exceeded

Related questions

6 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 07:47 AM

    You cannot run both the transactions at the same time.

    First you need to upload the material master and then upload the stock.

    For material master you need to use BDC. Its not possible to use LSMW easily.

    For material upload use LSMW. Very easy.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi

      Both activity are different so that we should not use one upload program. Both are run with different transactions.

      So, My suggestion is use different upload programs for material master and stock updation.

      Regards

      Hirendra

  • Posted on Dec 13, 2011 at 05:59 AM

    In LSMW it lets you choose only one uploading program at a time per object. So you'd have to do the material master (objec 0020) upload first and then stock upload (object 0110).

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 04:01 AM

    Hi,

    Use BDC for both uploads material and Stock upload.

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 13, 2011 at 04:05 AM

    HI

    To upload material master record and to upload stock are different things

    to upload stock you have to use movement type 561 and t-code also different for that and system will generate accounting document for same in system

    Regards

    Kailas Ugale

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 04:07 AM

    Dear Sangita,

    In lSMW when we do the recording there is provision for one T. code at a time so you need to do it in separate recording.

    But you can create one LSMW ,create 1 Project under that project create 2 sub projects 1 for Material upload and another for stock upload.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 13, 2011 at 04:34 AM

    Dear Sangita,

    You should run LSMW twice. "one time for Material master upload second for material stock".

    So first create LSMW for uploading material master for T-code MM01 and complete the recording and upload the file.then Create LSMW for T-code MB1C and create recording and upload file.

    Let me know for further clarification.

    Thank you,

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.